Friday, 27 July 2012

Jobs progressing well!


Today Steve breathed a sigh of relief. After the success of fitting the solar panel on Wednesday, he continued with the fitting of the holding tank [see below]Lots of extra pipework, not to mention holes cut in the deck [for the pump out fitting], and the bulkheads [for the pipework, and then last but not least, the 5 holes required for the fitting of the Blakes seacock.


Holding tank fitted in the cockpit locker


 Steve went a bit overboard with the sikaflex, however better too much than not enough. With the sea cock fitted, there was a sense of relief. May even have a day off tomorrow before making a start on the galley freshwater hand pump.
Sea cock fitted in a locker in the aft cabin heads and easily accessible


All this was displaced to make room for the new holding tank
Hmm, All this came out of the cockpit locker and somehow needs to go back in, or find a new home somewhere else on board.


 The arrival of the cockpit cushions was a bit of light relief this afternoon, and we indulged in a short daydream of sitting in the sun in a few weeks time, drinking a beer of course.
Our new cockpit cushions made for us by Troon upholstery.

2 comments:

  1. Sailed with Scotsail from Largs last weekend and heard about your planned adventure.
    Good luck and I look forward to reading your blog updates.
    Best Wishes
    Gary McC
    Chewsy crew 2004, 2011

    ReplyDelete
  2. Thanks Gary, for your message. Keep in touch

    ReplyDelete